Seven ways in, not one
A planned calendar of entry points lifted batch fill from 50–75% to over 90%.
Seats filled at course end50–75% to Over 90%
The situation
Admission opened once, at the start of a two-year course, so batches began 50–75% full and revenue per batch was left on the table. Competitors let students join late.
What I did
I designed a two-year academic calendar with seven planned entry points: any day in the first two months, a December rank batch, the start of Class 12, a revision batch after the portion is complete, a first crash course, the first week of January, and a crash course after the board exams.
Every entry point came with a week-by-week checklist for teachers, centre heads, admin and sales. A late joiner got a 20-minute pre-class summary from the teacher, recorded lessons for what they had missed, and an introduction to a small group of students on day one.
What changed
| Measure | Before | Now |
|---|---|---|
| Seats filled at course end | 50–75% | Over 90% |
| Revenue per batchAgainst what was previously occupied | Baseline | Almost 20% more |
| Extra teacher effort | Unplanned | About 20 minutes per late joiner |
| Parent complaints about joining mid-courseExpectations were set at each entry point | Expected | None |
What it cost, and where it stops working
The December rank batch is new. Its early signal, better exam marks and more confidence, is not yet a full cycle. The calendar assumes batches of about 50 students, with room to stretch to 60.
What it shows
Revenue design that does not cost teaching quality.
How this was measured
Internal admission and batch records. Fill is students enrolled divided by seat capacity at the end of the course. Revenue per batch compares fees from occupied seats before and after. Unaudited.
Kind of problem
Revenue design